Wastewater treatment facility basic design and pure oxygen generator supply and installation construction

Construction period
2017-04-24~2017-09-30
Orderer
Paper Korea Co., Ltd.
Construction overview
- Wastewater treatment volume : 10,000㎥/day
- BOD5 : 1,000㎎/ℓ
- Multi-stage enclosed structure
- Effect of application : Reduce land use and prevent secondary environmental pollution

S-Oil RUC Project A5

Construction period
2016-08-03~2018-02-15
Orderer
DAELIM
Construction overview
- Wastewater treatment volume : 20,000㎥/day/dd>
- CODMn : 560㎎/ℓ
- Multi-stage enclosed structure
- Effect of application : Reduce land use and prevent secondary environmental pollution

Lotte Confectionery Wastewater Treatment Project in India

Construction period
2014-10-21~2015-06-30
Orderer
LOTTE E&C
Construction overview
- Utility Works for LOTTE India Haryana Factory Project
- E2E Anaerobic Reactor
- Wastewater treatment volume : 200㎥/d
- BOD5 : 700 ㎎/ℓ
- Effect of application: Reduced wastewater treatment chemical costs, real estate savings

Hansol Paper Janghang Factory Wastewater Treatment Facility Construction

Construction period
2014-02-17~2014-10-15
Orderer
Hansol Paper Co., Ltd.
Construction overview
- Wastewater treatment volume : 4,000㎥/d
- BOD5 : 700㎎/ℓ
- Multi-stage enclosed structure
- Effect of application : Reduce land use and prevent secondary environmental pollution

Piping construction work for oxygen generation equipment at Hyundai Steel's Dangjin Plant No. 7

Construction period
2013-05-25~2014-03-30
Orderer
Hyundai Rotem Co., Ltd.
Construction overview
- Hyundai Steel Dangjin Plant
- Oxygen : 50,000㎥
- Nitrogen : 75,000㎥
- Argon : 1,500㎥

Eco-friendly wastewater treatment power plant facility construction

Construction period
2013-02-27~2013-11-15
Orderer
Jeonju Paper Co., Ltd
Construction overview
- Korea's first power generation project using wastewater treatment
- Wastewater treatment volume : 32,000㎥/d
- Power capacity: 2.8 MW (1.4 MW x 2Sets)
- Apply effect: Reduce wastewater treatment chemical costs
Increase production efficiency by improving reclaimed water quality
Commercial power supply 2.8 MW per hour

Hanwha Chemical Yeosu Orange PJT

Construction period
2012-02-01~2013-04-15
Orderer
Hanwha Corporation E&C Division
Construction overview
- Polysilicon production facility/bio plant
- CGMP New Construction
- Engineering and Mechanical/Piping Construction